Windows and doors Installation Considerations

  • Home
  • Windows and doors Installation Considerations

Windows and doors Installation Considerations

Aluminum windows and doors is the first choice for most families, aluminum alloy as persistent resistance excellent material for most families love. For middle families, aluminum windows and doors will not have too much pressure, but pay attention to the usual installation considerations, installation of Windows and doors flaws, follow-up questions will make you regret it!

  • 1.Dusting the surface of glass and aluminum, oil and water film, mortar and glass notch foreign body and within clean, smooth drainage holes, and review box fan switch is flexible.
  • 2.When using sealant fixed, it should adjust the vertical and horizontal position of the glass, and the glass sealant and bad mouth glued joints must be dry and clean.
  • 3.Glass installation preparation: the lower glass with a thickness of about 3mm neoprene pad pad in the groove, avoid direct contact with the glass box fan.
  • 4.Glass Installation: cut has been cut good aluminum frame fan seated in the glass, the glass in place should stop in the middle of the recess, and should have adequate embedding quantity. It should ensure that after assembly of glass and mosaic channel gap, and equipped with shock-absorbing pads in the main part, so that it can cushion the impact of opening and closing and other forces.
  • 5.Fixed with tape: first rubber bead on both sides of the glass tight squeeze, check the installation location is correct, should not be blocked drainage holes, then took a rubber bead evenly gluing (series silicone sealant) on the bead , re-layering sequence embedded within the fixed glass groove. Rubber batten size should be consistent with the actual size of the recess, its length should be shorter than the peripheral length of the glass, the corner should be cut into pieces and character angle connector with adhesive jail. Tape should be close to the glass and the notch, not loose, can not be installed deviation can not be forced to fill in the tape.
  • 6.When installing insulating glass and glass area larger than 0.65m² box located in the vertical glass, glass should be shelved in the same position two pads soil, resting point of the glass is not less than the vertical distance from the edge of the glass 1/4 wide, and not less than 150mm; fan located in the glass, it is determined by the position of the spacer in the opening direction, the positioning of the pad width should be greater than the thickness of the glass support, the length of not less than 25mm.
  • 7.Location can be set below the pad aluminum pads, pads, and pads are fixed to the frame fan.
  • 8.When you install the windward side glass, rear glass insert box must be promptly pass on both sides of a long strip of glass mosaic tight squeeze or pad secured to prevent gust smash the glass.
  • 9.Outside the glass door windows should be sealed with glass glue inlay, the glass should be integrally connected with the wrong frame.
  • 10.Check the pad, mosaic pieces are blocked drainage channels and drainage holes.
  • 11.Wipe the glass, close the Windows and doors.

Stay connected with us in your favorite flavor!